The basement is done! Well, sort of. We failed the final inspection, not to the fault of the contractor, but a grumpy building inspector, so we have a few outstanding issues (if make-up air is needed and the need to extend the hearth). But we have started to move the boys into their "new playroom" (as they call it) - and they LOVE it! It is a huge space for them to run, jump, flop, tackle, crash, etc.
From this:
To this:
The best part of the new playroom is the opening under the stairs. Rob kept the boys laughing by chasing them around the stairs for a good 20 minutes!
New storage in the laundry room
Mud room area (boiler room to the left, laundry room to the right). We opted to not finish the floor here because this will be how the boys go to and from the backyard to play. We're also hoping to use this space for messy arts and crafts.
Subscribe to:
Post Comments (Atom)
2 comments:
This looks awesome! We can't wait to come and test it out with playgroup! Have a Merry Christmas!
This is amazing!! Great job. Is that the future milk fridge for the boys?? ;-)
Love
Lala
Post a Comment