The fake wall was torn down and a new one was built, and all walls were framed and insulated. The windows and windows were replaced.

This was the backside of the room. We have divided this space into a laundry room (on the left side of the photo), a large mudroom (in the middle), and a boiler room (the right side of the photo).

This photo is the mudroom. So the boiler room is to the left and new laundry storage room is to the right.

The blueboard, plaster and paint are now complete (though I don't have any new photos). The recessed lights are in (the boys would destroy any lamps), a new heating zone is nearly complete, the shelves will be built on Monday and the carpet will be the last step. So it should be complete next week - after 6 weeks! We can't wait to show the boys their new space!